The total construction amount should not be less than the 20-story tall buildings. It is advisable to use a different conventional construction process. First, the partition structure should be built and the outer walls should be closed in the non-cold season, and then the MSE insulation radiators that are already necessary for tall buildings in farmland should be installed. All facilities should be carefully installed in a constant temperature environment. This work environment is not cold all year round. If one row of MSE insulated radiators is not hot enough, install two or even more rows until warm enough. The construction sites that symbolize the characteristics of the new era and are not cold all year round cannot be pushed at once. It is necessary to first try building one or two buildings to gain necessary experience, and then further improve and promote them on this basis.
|
|