We are construction designing, manufacturing & installing and technology-exporting company group. We can build cement factory/plant with capacity of 1000-10000t/d on turnkey basis.
The investment in building first-rank cement factory including design, installation, training and transportation is from about FOB $28.5million for every 1000t/d capacity. The cost of establishing a first-class armoured concrete mixing plant with capacity of 300,000m3/a is from about FOB $6million (with transportation).
Among our various successful cement projects for our foreign investor or property developer and dealer, the most typical ones are the Najran Cement Company (NCC) with their leading Operation & Maintenance of 9000 TPD Cement Plant in Saudi Arabia, Atbara Cement Company of 5300 TPD production line plus Berber Cement Company of 4800 TPD in Sudan, Lucky Cement Limited's dry process Cement Plant with 4200 TPD capacity plus Attock Cement Pakistan Limited (ACPL) with 3000TPD capacity in Pakistan and etc.
OUR BUILT CEMENT PLANT/FACTORY PROJECTS
-----------------------------------------------------------------------
5000t/d & up
01 Saudi Arab NCC Cement Factory Project (6000+3000)t/d finished
02 ShanDong LuHong 6000t/d finished
03 ZheJiang SanShi(FuYang) 5000t/d 2004.07 finished
04 ZheJiang SanShi(JianDe) 5000t/d 2004.08 finished
05 ShanDong LuNan 5000t/d 2004.11 finished
06 ShanDong ShanShui 5000t/d 2005.01 finished
07 ZheJiang JinYuan 5000t/d 2004.12 finished
08 ZheJiang LiMa 5000t/d 2005.06 finished
09 JiangXi HongShi 5000t/d 2005.07 finished
10 ShanDong ShenFeng 5000t/d 2006.09 finished
2500t/d-4000t/d
01 ZheJiang JinYuan1 2500t/d 2002.09 finished
02 ZheJiang SanShi(TongLu) 2500t/d 2003.07 finished
03 ZheJiang SanShi(ShaoXing) 2500t/d 2003.08 finished
04 ZheJiang JinYuan2 2500t/d 2003.12 finished
05 ZheJiang ShenHe 2500t/d 2003.12 finished
06 ShanXi ShengWei 2500t/d 2004.03 finished
07 ZheJiang ZhongXinYuan 2500t/d 2004.04 finished
08 AnHui ZhenZhu 2500t/d 2004.08 finished
09 ZheJiang LiuTongShan 2500t/d 2004.08 finished
10 JiangXi XinShan 2500t/d 2004.09 finished
11 HuBei LeiShan 2500t/d 2004.10 finished
12 JiangXiJiSan 2500t/d 2004.11 finished
13 ZheJiang DuShan 2500t/d 2005.03 finished
14 JiangSu HeLin 2500t/d 2005.04 finished
15 JiangXi ZhengDa 2500t/d 2004.11 finished
16 HuBei YongXing 2500t/d 2005.08 finished
17 ShanXi ShengWei 2500t/d (the second) under construction
18 AnHui LongYuan 2500t/d 2005.10 finished
19 JiLin JinYuan 2500t/d 2006.05 finished
20 JiangXi RiJiang 2500t/d 2006.07 finished
21 ZheJiang HuYing 2500t/d 2005.09 finished
22 HeiLongJiang HongJi 2500t/d 2005.12 finished
23 LiaoNing DaHuoFang 2500t/d 2006.06 finished
24 ZheJiang HuQiu 4000t/d 2005.11 finished
25 HuNan ShaoFeng 2500t/d under construction
26 ShanXi ZhongXiShui 2500t/d under construction
27 SiChuan XiChang 2500t/d under construction
28 YuNan YuanDong 2500t/d under construction
29 DaLian JinShan 2500t/d under construction
30 HuNan YunFeng 2500t/d under construction
31 HeNan ShiJiXinFeng 3200t/d under construction
1000t/d-2000t/d
01 ZheJiang ShengWei 1300t/d 2002.12 finished
02 DaLian JinShan 1000t/d 2003.01 finished
03 AnHui HengGu 1300t/d 2003.08 finished
04 JiangXi WanJi 1500t/d 2003.12 finished
05 JiangXi GanXing 1000t/d 2004.02 finished
06 HeNan ZhongJin 1200t/d 2004.02 finished
07 JiangXi XinShiJi 1500t/d 2004.05 finished
08 JiangXi HuaXia 1500t/d 2004.05 finished
09 HuBei SanYuan 1500t/d 2004.05 finished
10 ChongQing JuLi 1500t/d 2004.09 finished
11 ShanXi HuaTai 1300t/d 2006.06 finished
12 ShanDong MiShan 1300t/d 2006.3 finished
13 ZheJiang HuQiu 2000t/d 2003.07 finished
14 ZheJiang DaJian 2000t/d 2004.02 finished
15 HeNan ZhongJin 1500t/d under construction
16 YunNan HaoLong 2000t/d under construction
ATTACHMENT
Plant Items for Choice
-----------------------------
All the items below for choice constitute a complete cement plant. All the the items with the ^ -marked ahead of the line, will be the least items to build a armored concrete mixing plant/station. Welcome negotiation.
x01- limestone transportation
x02- clay crushing & transportation
x03- pre-homogenization, storage & transportation of raw materials
x04- raw meal drying & grinding
x05- mixing before production & storage
x06- preheater in the kiln inlet
x07- kiln body
x08- kiln outlet & clinker crushing
^09- clinker storage & transportation
^10- cement grinding
^11- fuel preparation
^12- water injection tower & filter
^13- controlling center
^14- electric meter room
^15- automatic meter room
^16- analysing room
^17- air pump station
^18- power transformer substation
x19- clay deck
x20- combining store
^21- slag drying & transportation
^22- slag storage & transportation
^23- cement storage
^24- cement packing & end product store
^25- bag cement loading area
^26- bulk cement loading area
^27- gypsum crushing & transportation
^28- gypsum & iron-powder transportation
^29- wet-slag transportation
^30- gypsum storage
x31- fuel field
^32- iron-powder field
^33- slag field
^34- main power transformer station
^35- water pump, pool & tower
^36- office building
x37- dining room
x38- shower room
x39- boiler room
x40- breast-feeding room
^41- material unloading station
^42- fireproof material storage
x43- gas station
x44- garage
^45- auto-fixing shop
^46- machinery shop
x47- electric shop
x48- spare parts storage
x49- construction shop
x50- shop office
x51- weld & cast shop
x52- calcium carbide & oxygen storage
x53- cement bag production shop
^54- hoisting machine & winding engine
^55- dispatcher station
^56- toilet
^57- bulk cement for loading
^58- air pump for bag cement packing
^59- security guard station
x60- diesel generator station
^61- ground weigher
|